Crushed stone deposit
Offered for sale, or as an investment object for joint development, is a sandstone deposit for the production of M1200 grade crushed stone. The deposit is located within the boundaries of the Obukhovskoye deposit in the Krasnosulinsky district of the Rostov region. Administratively, the field is located 5 km south of the Bozhkovskaya railway station in the Krasnosulinsky district of the Rostov region. The nearest settlements are Art. Vladimirovskaya (12 km southwest) and kh. Sadki (12 km to the southeast). 10 km to the exit to the largest highway of the Southern Federal District - the M4 Don highway; 110 km to Rostov-on-Don. Our own railway line is being completed to the field with a capacity of 2 “turntables” per day. Crushed stone - sandstone is considered an excellent filler for high-strength concrete. It serves as the main material in the construction of highways, the production of high-strength concrete, and the construction of foundations for massive structures. Industrial crushed stone is used in the construction of railway roads, the production of concrete and reinforced concrete products; in railway, hydro, aero, military, space objects. The field has proven reserves of 4.5 million m3 in solids. The investment object includes: 1) a land plot with an area of 225,400 sq. m - the deposit itself, there is a permit for geological study, exploration and production of sandstones, a technical project for the development and reclamation of a sandstone quarry was approved on 07/05/2018 by the Ministry of Natural Resources of the Rostov Region . A license valid until 2040 was obtained. Preliminary boundaries of the mining allotment have been received, the procedure for registering a hazardous production facility with Rostechnadzor has been launched.; 2) a land plot with an area of 121,500 sq. m - intended for the placement of an industrial site and dumps, is at the stage of being transferred to its intended purpose. Both land plots are owned. Common areas are demarcated and have their own configuration. This investment object is located 100 meters from an active quarry with a weighing and its own production site and other infrastructure. Owner. Bargain. When developing jointly, the terms of cooperation are discussed individually.
- Russian Federation
- Crushed stone
- Under development
- Earth
- Buildings and constructions
- Driveways
- Railway
No reviews found